It’s good to see that the work I have completed in the past and then taken time to post on my website here as a project sometimes pays off.
A large building company in London contacted me directly as a result of seeing frames on my website created for a Topping Out Ceremony. This is traditionally when the full height of a building is reached and the framework completed. Nowadays often used for public relations purposes.
The company required 2 frames containing heavy powder coated steel constructors spanners and large nuts and bolts. The glazing was to be etched with text relating to the presentation at the topping out ceremony presentation in London. I had to make boxes to sit behind the black box frames and wire in the heavy spanners and nuts and bolts. A glass company in Southampton sand blasted the text onto the pre-cut glazing and it was finally all put together only a few hours before the ceremony in London.